Named after the promise of hope in Jeremiah 29:11, our Mission 29:11 project is an ongoing effort to refresh and renew the Bethany campus. We are currently updating our building—including new accessibility features and modernizing our ministry spaces—to create a more welcoming environment for worship, fellowship, and community service.

To give to Mission 29:11,
just click here or use an envelope in the church lobby.

    • The parking lot was patched some rough areas, cracks were tarred, and then the entire surface was sealed with fresh parking lines.

    • The Kids Connection check in area was updated with fresh wall graphics and given a new check in desk.

    • The Kids Connection area downstairs was repainted brighter and soundproofing panels were mounted on the walls.

    • What was the old library right off the lobby and near the main entrance, was transformed into a dedicated Common Grounds area, which will allow for better flow of people and create a space to build relationships.

    • A dedicated newborn nursery remodel was finished.

    • Windows in the auditorium have been changed to new glass block windows creating a brighter atmosphere.

    • Cupboards are being added to the new Common Grounds area.

    • Youth Room is getting a new floor and makeover to prepare for the new school year.  

    • Working with the architects to get the best plans and estimates possible for a future elevator and basement bathroom upgrades

    • Congregational mailboxes are being repainted and new name labels will be included after painting.

    • Replace flooring and seating in the auditorium - GOAL for the Summer 2026

    • Redesign and give the foyer a new makeover

    • Air conditioners being repaired and/or upgraded.