Named after the promise of hope in Jeremiah 29:11, our Mission 29:11 project is an ongoing effort to refresh and renew the Bethany campus. We are currently updating our building—including new accessibility features and modernizing our ministry spaces—to create a more welcoming environment for worship, fellowship, and community service.

To give to Mission 29:11,
just click here or use an envelope in the church lobby.

    • The parking lot was patched in some rough areas, cracks were tarred, and then the entire surface was sealed with fresh parking lines.

    • The Kids Connection check-in area was updated with fresh wall graphics and a new check-in desk.

    • The Kids Connection area downstairs was repainted in a brighter color, and soundproofing panels were mounted on the walls.

    • What was the old library right off the lobby and near the main entrance, was transformed into a dedicated Common Grounds area, which will allow for better flow of people and create a space to build relationships.

    • A dedicated newborn nursery remodel was finished.

    • Windows in the auditorium have been changed to new glass block windows creating a brighter atmosphere.

    • Youth Room got a new floor and makeover.

    • Congregational mailboxes were repainted and new name labels attached.

    • Air conditioning units were repaired and/or replaced.

    • New countertops are being added to the Common Grounds area.

    • Replace flooring and seating in the Worship Center - GOAL for the Summer 2026

    • Redesign and give the lobby a new makeover

    • Working with the architects to get the best plans and estimates possible for a future elevator and basement bathroom upgrades

    • Worship Center platform to be updated.

    • Improve lighting in the Worship Center